IR Campbell Construction
HomeContact

CB, SMH & DMH Installation

What We Cover
Catch BasinsSewer ManholesDrain ManholesInvert and Rim SettingPipe Connections

Catch Basin and Manhole Installation
in Massachusetts.

01
CB, SMH, DMH Installation

We set catch basins (CB), sewer manholes (SMH), and drain manholes (DMH) to the invert and rim elevations on your civil plan. Precast structures are placed, connected, and backfilled so inspections pass the first time.

  • Catch basin installation and grate setting
  • Sewer manhole setting, inverts, and frames
  • Drain manhole installation and pipe connections
  • Rim elevation adjustment to finished grade
  • Coordination with utility inspectors and civil drawings

Set Right.
Passes the First Time.

Precision
Set to Invert and Rim

Catch basins and manholes only work if elevations are exact. We set every structure to the invert, rim, and alignment on your civil drawings so drainage and sewer systems perform as designed.

Inspection-Ready
Passes the First Time

We don't backfill until inspection sign-off is received, so structures set today don't become rework tomorrow.

Experience
Proven Across Massachusetts

Our structure installation work spans multifamily, commercial, and municipal projects throughout Massachusetts. Licensed and fully compliant on every project type.

Common Questions

What developers, GCs, and project owners typically ask before engaging IR Campbell for catch basin and manhole installation.

Yes. We install catch basins (CB), sewer manholes (SMH), and drain manholes (DMH) to the invert and rim elevations on your civil plan, including frames, grates, and pipe connections.
Most catch basins and manholes we set are precast concrete for speed and consistency, but we build poured-in-place structures where the design or field conditions call for it.
We verify elevations by survey before and after each structure is set, checking against the invert and rim called out on your civil drawings before we move on to backfill.
Yes. All inlet and outlet pipe connections are made and sealed as part of the structure installation, tied into the storm or sewer network on the same visit.
Use the contact form on our site. Sharing your civil utility plan with structure schedules helps us provide a faster and more accurate estimate.

Ready to
Set It Right?

Tell us about your project. Our structure installation team reviews every inquiry and responds within one business day.